Plan the last 50 feet before the first mile

Built off site. Planned for the site.

A ModuStone unit arrives as substantial masonry, not a box of loose parts. That makes installation faster, but it also means the base, access, lifting plan and final position need to be confirmed before delivery day.

Site access reviewedBase confirmedLifting plannedFreight quoted
Placement
Delivery starts with the site plan.We confirm how the unit gets from the truck to its finished position before it leaves.

Four parts of a successful delivery

The unit is only one piece of the plan.

The safest and most efficient installations happen when access, foundations, lifting and final connections are resolved before the truck arrives.

01

Access

We look at driveway width, grades, overhead restrictions, turning room, ground conditions and the distance from the unloading point to the final location.

02

Base

The receiving pad or foundation must be complete, level, appropriately sized and suitable for the finished unit before placement is scheduled.

03

Lifting

The lifting method needs to match the product, reach and site. Depending on the project, that may involve a telehandler, crane or other suitable equipment.

04

Connections

Gas, electrical, appliance, chimney or other project-specific connections should be coordinated with the appropriate trades and local requirements.

Before delivery is booked

What we need to know about your site.

A few photographs and measurements can answer most of the important questions early. For unusual sites, we may ask for additional details before quoting placement.

01Exact delivery address

Including postal code and any restrictions affecting large vehicles.

02Access photographs

Driveway entrance, route through the property and final installation area.

03Final position

Where the product will sit and how far it is from the likely unloading point.

04Base dimensions

Confirmation that the pad or foundation matches the product requirements.

05Overhead clearance

Trees, wires, rooflines or other obstacles that could affect lifting equipment.

06Utilities and services

Any gas, electrical or other services that must be ready before final installation.

Receiving base

A good installation starts underneath the stone.

The base is project-specific. Product type, soil conditions, frost, drainage and local requirements all matter, so final preparation details should be confirmed for the unit being ordered.

ModuStone unit
Prepared structural base
Compacted / engineered support as required
Finished grade & drainage
LEVELFlat and accurately placed

The receiving surface should allow the unit to sit correctly without improvised shimming or last-minute corrections.

CAPACITYDesigned for substantial masonry weight

These are permanent outdoor features. The supporting base must be appropriate to the size and weight of the selected product.

DRAINAGEWater needs somewhere to go

Good grading and drainage around the finished installation help protect both the base and surrounding hardscape.

TIMINGComplete before the delivery date

Placement should not be scheduled while a base is still being formed, curing or waiting on surrounding site work.

Representative product weights

Plan for masonry weight, not patio-furniture weight.

Final shipping and lifting information is confirmed for each order, but representative products show why site planning matters.

01

Standard fire pit

48" × 48", approximately 22" high and about 2,600 lb, depending on finish.

02

8-foot fireplace

A representative fireplace is approximately 8,000 lb and planned as a two-piece assembly for transport and placement.

03

XL & configured products

Large fire pits, kitchens and custom configurations are confirmed individually because final weight changes with size, stone and equipment selections.

04

Equipment follows the load

Crane, telehandler, forklift or other lifting equipment is selected around actual weight, reach, ground conditions and access.

From our yard to your finished space

How delivery and placement normally work.

01

Confirm the product

We establish the unit, dimensions, finish and any options that can affect final size or weight.

02

Review the destination

We confirm the address, site access, base, lifting reach and any unusual constraints.

03

Quote the logistics

Pickup, local delivery, regional freight and placement requirements are determined for the actual project.

04

Prepare the site

The receiving base, access route and required services are completed before the scheduled date.

05

Deliver and set

The unit is unloaded and moved into its final position using the agreed lifting plan.

06

Finish the project

Required connections, finishing details and surrounding landscape or hardscape work are completed.

Delivery options

Local project or long-distance freight, the plan changes with the destination.

We do not hide the cost of moving heavy masonry inside an inflated flat shipping price. Delivery is matched to the actual unit and destination.

Pickup

Contractor or customer pickup

Suitable orders can be prepared for pickup once the vehicle, trailer, loading method and securement requirements are confirmed.

Local

Direct project delivery

For projects within our practical delivery area, transportation and placement can be quoted as part of the order.

Canada-wide

Freight delivery

For longer distances across Canada, freight is quoted after the finished product, destination, unloading requirements and site conditions are known.

Why isn't freight just a flat rate?

A fire pit going to a commercial yard beside a highway is a very different delivery from a larger unit going behind a house down a narrow residential drive. Quoting the actual logistics keeps the product price honest and the delivery plan realistic.

Get a Delivery Quote

Who handles what?

Clear responsibilities make delivery day uneventful, which is exactly what we want.

Each order can be different, but the responsibilities are established before delivery rather than worked out beside a truck with a masonry unit waiting on it.

ModuStoneProduct and logistics information

Unit details, handling requirements, agreed transportation and project-specific information needed to plan receipt.

Customer / contractorSite readiness and access

A completed receiving base, clear and suitable access, required permits and coordination of site trades unless specifically included otherwise.

Qualified tradesRegulated connections

Gas, electrical and other regulated work should be completed by the appropriate qualified professionals where required.

Delivery & installation FAQ

Questions worth answering before the truck is booked.

Do you deliver outside Prince Edward Island?

Yes. ModuStone can plan regional and longer-distance delivery across Canada. The cost and method depend on the product, destination, freight requirements and receiving or unloading plan.

Is delivery included in the product price?

Unless a quote specifically says otherwise, delivery and placement should be treated as project-specific. Heavy masonry products are better quoted against the real destination than assigned an arbitrary flat shipping rate.

Can you place the unit in the backyard?

Yes, when access, ground conditions and lifting reach allow it. A location that is easy to walk to is not necessarily accessible to the equipment required to move a substantial masonry unit, so we review the route before booking placement.

Does the concrete pad need to be finished before delivery?

Yes. The receiving base should be complete and ready to accept the unit before placement is scheduled. We can provide product-specific information needed for planning the base.

What happens if the site is not ready on delivery day?

If safe access, the receiving base or the agreed lifting conditions are not available, placement may need to be postponed and additional transportation or equipment costs may result. That is why we review site readiness beforehand.

Can my own contractor receive and install the unit?

Yes. ModuStone is intended to work well with contractors. We can provide dimensions, approximate weight, handling information and site requirements needed to coordinate the installation plan.

What lifting equipment will I need?

The correct machine depends on the unit weight, required reach, ground conditions and site access. A telehandler, forklift, crane or other suitable lifting equipment may be used. The equipment plan should be based on the order-specific handling information rather than a general assumption.

How long does placement take?

Once the base, access and lifting plan are ready, the actual set can often be completed in hours. Larger or more complex projects can take longer, especially where multiple modules, chimney work, utilities or surrounding hardscape are involved.

Have a location in mind?

Send us the product you are considering, your postal code, a few access photographs and where you want the unit to finish. We can start building the delivery plan from there.